Find the battery size before you lock the grid connection

You have a site, a megawatt target, and maybe a contract price. If you freeze the connection too early, you lock a battery that is too small or too expensive to finance.

Recommended Case vs max IRR

More hours can raise return until coverage slips. The star is the size we would take to a lender, not the peak return.

4h
100 MW

Recommended Case

400 MWh · 12.31% IRR · 1.37x DSCR

Max IRR (not the bank pack)

600 MWh · 13.8% IRR · 1.26x DSCR

This is a demo with sample numbers. The live model uses your node, prices, and costs.

Size your project for real

Why size first

Teams often lock the POI (the grid connection) before they know how large the battery should be. Too small leaves midday energy unused. Too large can look strong on a return chart and then fail when a bank sizes debt.

We test many sizes first: solar megawatts, battery megawatt-hours, and 2 to 8 hours of storage. Each size is scored on hourly prices at your Chile barra or Mexico node.

What the study includes

The Configuration Optimizer tests the size grid. Then the battery charges and discharges on the actual price series for the site, under a contract, as a merchant plant, or both. We do not paste an annual revenue line into Excel.

  • Solar MW, battery MWh, and duration from 2 to 8 hours
  • Contracted, merchant, or a mix
  • Chile and Mexico node catalogs
  • Capacity payments where the market pays them

How we pick a size

We do not pick the highest IRR. We pick a Recommended Case that still clears the contract, a merchant cap, and lender tests. That becomes the Report Case: the one case that goes to the committee and the bank.

Move the sliders above to see the idea. Those numbers are sample data. A live study uses your costs, your node, and the Chile, Mexico, or Argentina engine.

What you walk away with

  • A sizing table across MW, MWh, and duration
  • The Recommended Case, and why the highest return lost
  • Tables for the development team and the committee
  • A path into cash flow and coverage on that same case